Standard Process

Submittals shall include:

Application (Stormwater Phase II Post-Construction Management Form)(Original Signature), Supplemental EZ forms, and Operations and Maintenance Agreement EZ forms.  Storm EZ (Optional method) for submittal.

One (1) set of folded plans (24" X 36") sealed by a North Carolina design professional

all stormwater control design elements
details for each stormwater control measure used on plan
legend of symbols used

One (1) electronic (PDF format) set of drawing (signed and sealed).
One (1) electronic (PDF format) set of design calculations.
All notarized paperwork with original signature must be submitted in hardcopy.
Designer Checklist (electronic)
Narrative (electronic)
Payment. See link to left for Fees (Standard) information.

* All Stormwater Control measures must comply with the latest NC Stormwater BMP Manual.

Stormwater Management Application

This form is commonly filled out incorrectly which delays the permitting process. The form must be signed by the appropriate signatory. If the applicant is not the owner of record the permission authorization section must be filled out.

Review Time

Complete submittals will be reviewed on a first in first out basis.

Review time for new submittals - 30 working days.

Review time for re-submittals - 15 working days.