NPDES (NCG01) and Self Inspection Information

The NPDES construction stormwater permit process changed on April 1, 2019.  See documents below for more information or go to NC DEQ Construction Stormwater Webpage by clicking on this link.

The two sheets below are required to be included as part of the SESC plan. The plan sheets are provided below in PDF format for your convenience. If would like a CAD versions of these sheets contact our office. 

  • DEMLR NCG01 GROUND STABILIZATION AND MATERIALS HANDLING SHEET 03-29-19
  • DEMLR NCG01 SELF INSPECTION SHEET REVISED 05-17-2019