City of Hendersonville Erosion Control Submittal Requirements
- Application (Financial Responsible Owner Form)(Original Signature)
- One (1) set of plans (11" X 17") sealed by a North Carolina design professional
- NPDES Stormwater General Permit Requirements and Self-Inspection requirements must be included on plan in the notes.
- all erosion control design elements
- details for each erosion control measure used on plan
- legend of symbols used
- One (1) electronic (PDF format) set of drawing (signed and sealed).
- One (1) electronic (PDF format) set of design calculations.
- All notarized paperwork with original signature.
- Designer Checklist
- Narrative
- Payment. See link to left for Fees information.
* All erosion and Sediment Control details must comply with the latest detail in the NC Erosion and Sediment Control Planning & Design Manual Chapter 6.
Financial Responsibility and Ownership (FRO).
This form is commonly filled out incorrectly which delays the permitting process. The form must be signed by the appropriate financially responsible party. If the applicant is not the owner of record a permission authorization form must be filled out and included with the FRO.
Review Time
Complete submittals will be reviewed on a first in first out basis.
Review time for new submittals - 30 working days.
Review time for re-submittals - 15 working days.