Approved fees for FY 2018-2019
Stormwater Application Fees NEW as of July 1, 2018 |
|
Vacant Parcels of Land to be developed: |
|
Stormwater Phase II Post Construction - High Density - (Exceeds 24% impervious surface and land disturbance exceeds one (1) acre) - (New) |
$505.00 |
Stormwater Phase II Post Construction - Low Density (less than 24 % impervious surface and land disturbance equals one (1) acre) - (New) |
$505.00 |
Expansions or Redevelopment: (increase in impervious surface over 1000 SF) |
|
Stormwater Phase II Post Construction - High Density (Exceeds 24 % impervious surface) (New) |
$505.00 |
Stormwater Phase II Post Construction - Low Density (Less than or Equal to 24 % impervious surface) (New) |
$505.00 |
Revisions to already approved plans: | |
Stormwater Phase II Post Construction - High Density (increases in the impervious surface from the original submittal) | $250.00 |
Stormwater Phase II Post Construction - Low Density (increases in the impervious surface from the original submittal but does not exceed Low Density limitations) | $250.00 |
Renewals: | |
Stormwater Phase II Post Construction - High Density Only - (due Every eight (8) years) | $505.00 |
Trip Charge (when a complaint warrants repairs or permits) | $50.00/trip |
Appeals | Advertising Fees Only |