42-87. Advisory Provisions
- Soils Map. Applicants for subdivisions with lots smaller than one (1) acre in size should consult a soils map of the property and be knowledgeable of the suitability of ground absorption systems on the property.
- Utility Easements. Utility easements should be:
- Centered on rear or side lot lines,
- At least 20 feet in total width, and
- Identified following discussion with the appropriate utility agency.
- Stream Setbacks. See §42-250 (Perennial and Intermittent Surface Water Buffers).
- Traffic Impact Study (TIS) and Emergency Services Impact Report (ESIR). See Article IV (Adequate Public Facilities Regulations) for traffic impact study and emergency services impact report requirements.