42-235.3 Effect on Outstanding Building Permits
Nothing herein contained shall require any change in the plans, construction, size or designated use of any development or any part thereof for which a Building Permit has been granted by the Building Codes Administrator or his authorized agents before the time of passage of this Subpart A (July 5, 2005); provided, however, that when construction is not begun under such outstanding permit within a period of six (6) months subsequent to passage of this subpart or any revision thereto, construction or use shall be in conformity with the provisions of this Subpart A.